| Title | High performance concrete in Washington state SR 18/SR 516 overcrossing : interim report on girder monitoring |
|---|---|
| Record ID | 17679 |
| Personal Name Creator |
Barr, P.; Fekete, E.; Eberhard, M.; Stanton, J.; Khaleghi, B.; Hsieh, J. C. |
| Source | 160p. in various pagings |
| Corporate Creator | Washington (State). Department of Transportation; University of Washington |
| Publisher | Turner-Fairbank Highway Research Center |
| Publication Date | 20000400 |
| Language | English |
| Abstract | In the mid 1990's the FHWA established a High Performance Concrete (HPC) program aimed at demonstrating the positive effects of utilizing HPC in bridges. Research on the benefits of using high performance concrete for bridges has shown a number of benefits. These include increased span capacities, or wider girder spacings (and hence a fewer number of girders); increased concrete compressive and flexural capacities; and improved concrete durability. However, inspite all of these positive research results, relatively little has been done regarding the implementation of high performance concrete in bridges in the United States. The general goals of the FHWA program are: to encourage the States to implement HPC in bridges; to develop appropriate mix designs and establish quality control procedures; to encourage the use of larger diameter (15mm (0.6")) prestressing strands in the girders; to evaluate the performance of the structure; and to provide for technology transfer through development of a workshop (showcase). This report presents interim results of the effectiveness of using HPC in prestressed precast concrete girders on a bridge in the state of Washington. State Route 516 utilizes WSDOT 74G pretensioned I-girders with a 190 mm cast-in-place composite deck. The girders were fabricated with 15mm diameter prestressing strands at 50 mm spacing, and designed for a concrete compressive strength of 69 MPa at 56 days. This report documents fabrication of a test girder and the bridge girders; provides a description of the instrumentation program; presents the measured data including strain, camber, temperature time histories, and prestress losses; and evaluates the accuracy of the prestress loss equations in predicting observed prestress losses. This is the first of a two part interim report. The second report is titled, ‘High Performance Concrete in Washington State SR18/SR516 Overcrossing: Interim Report on Materials Tests’. |
| Rosap ID | dot:15401 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/15401 |
| TRT Terms | Pavement performance; High performance concrete; Bridges; Girder bridges |
| General Subjects | Bridges(Structures); Compressive strength; Concrete durability; Flexural strength; Girders; High performance concrete; High strength concretes; Highway bridges; Monitoring; Prestressed concrete; Washington(State) |
| Classification | NTL - HIGHWAY/ROAD TRANSPORTATION - Bridges and Structures; NTL - HIGHWAY/ROAD TRANSPORTATION - HIGHWAY/ROAD TRANSPORTATION; NTL - HIGHWAY/ROAD TRANSPORTATION - Pavement Management and Performance |
| Geographical Coverage |
Washington |
| OCLC | 47994232 |
| TRIS Online Accession No |
795289 |
| Contract Number | DTFH71-96-TE036-WA-28 |
| Resource type | Tech Report |
| URL | https://ntlrepository.blob.core.windows.net/lib/17000/17600/17679/PB2001102924.pdf |
| Format | |
| Database | NTL Digital Repository |