NTL Record

Title Price Trends for Federal-Aid Highway Construction: 1987 Base, Second Quarter 1997
Record ID 20970
Source 8p. in various pagings
Corporate Creator United States. Federal Highway Administration
Publisher United States. Federal Highway Administration
Publication Date 19970000
Language English
Abstract The three-quarter moving composite price index is the weighted average of the indices for three consecutive quarters. The Composite Bid Price Index is composed of six indicator items: common excavation, to indicate the price trend for all roadway excavation; portland cement concrete pavement and bituminous concrete pavement, to indicate the price trend for all surfacing types; and reinforcing steel, structural steel, and structural concrete, to indicate the price tremd for structures. Desscriptions of the six indicator items can be found in Federal-aid Policy Guide G-6011-10.
Rosap ID dot:5390
Rosap URL https://rosap.ntl.bts.gov/view/dot/5390
TRT Terms Datasets; Federal aid highways; Road construction; Costs; Pricing; Road construction industry
General Subjects Construction costs; Cost indexes; Excavating; Graphs(Charts); Highway construction; Portland cements; Prices; Reinforcing steels; States(United States); Trends
Classification NTL - HIGHWAY/ROAD TRANSPORTATION - HIGHWAY/ROAD TRANSPORTATION;
NTL - HIGHWAY/ROAD TRANSPORTATION - Construction and Maintenance;
NTL - REFERENCES AND DIRECTORIES - Statistics
Geographical
Coverage
United States
OCLC 5187225
Report Number FHWA/PD-98/009
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/20000/20900/20970/PB98163207.pdf
Format PDF
Database NTL Digital Repository