NTL Record

Title Price Trends for Federal-Aid Highway Construction: 1987 Base, First Quarter 1998
Record ID 21199
Source 8p. in various pagings
Corporate Creator United States. Federal Highway Administration
Publisher United States. Federal Highway Administration
Publication Date 19980100
Language English
Abstract The three-quarter moving composite price index is the weighted average of the indices for three consecutive quarters. The Composite Bid Price Index is composed of six indicator items: common excavation, to indicate the price trend for all roadway excavation; portland cement concrete pavement and bituminous concrete pavement, to indicate the price trend for all surfacing types; and reinforcing steel, structural steel, and structural concrete, to indicate the price tremd for structures. Desscriptions of the six indicator items can be found in Federal-aid Policy Guide G-6011-10.
Rosap ID dot:5400
Rosap URL https://rosap.ntl.bts.gov/view/dot/5400
TRT Terms Datasets; Road construction; Pricing; Federal aid highways; Road construction industry; Costs; Building materials; Types of concrete; Expenses; Federal aid; Indirect costs; Labor; Overhead costs; Prices; Road materials; Steel by end use; Statistical trends
General Subjects Highway construction; Highway costs
Classification NTL - HIGHWAY/ROAD TRANSPORTATION - Construction and Maintenance;
NTL - HIGHWAY/ROAD TRANSPORTATION - HIGHWAY/ROAD TRANSPORTATION;
NTL - REFERENCES AND DIRECTORIES - Statistics
Geographical
Coverage
United States
OCLC 5187225
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/21000/21100/21199/PB99104283.pdf
Format PDF
Database NTL Digital Repository