| Title | Seattle/Lake Washington Corridor Tolling and Transit Projects |
|---|---|
| Record ID | 51686 |
| Corporate Creator | United States. Federal Highway Administration |
| Publisher | United States. Federal Highway Administration |
| Publication Date | 20110101 |
| Language | English |
| Abstract | The Lake Washington Urban Partnership will result in implementation of variable pricing on the State Route 520 floating bridge that currently carries about 160,000 people per day between Seattle, Bellevue, and its eastside suburbs and improved bus service. The variable tolls on the existing bridge are intended to help pay for the new bridge, and there is a desire for tolls to pay for transit operations as well. |
| Rosap ID | dot:41945 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/41945 |
| TRT Terms | Variable tolls; Bus transit; Integrated corridor management; Bridges; Urban areas; Urban transit; Urban travel; Evaluation |
| Geographical Coverage |
United States; Seattle (Washington) |
| Report Number | FHWA-JPO-11-045 |
| Resource type | Tech Report |
| URL | https://ntlrepository.blob.core.windows.net/lib/51000/51600/51686/11-045.pdf |
| Format | |
| Database | NTL Digital Repository |