| Title | US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project. |
|---|---|
| Record ID | 54136 |
| Corporate Creator | United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office |
| Corporate Contributor |
United States. Federal Highway Administration; United States. Department of Transportation. Research and Innovative Technology Administration |
| Publisher | United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office |
| Publication Date | 20101200 |
| Language | English |
| Abstract | This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS) Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how well it is to perform (the performance requirements), and under what conditions (non-functional and performance requirements). This document does not define how the system is to be built; that is the providence of the design document. This document pulls together requirements from a number of sources including but not limited to the Concept of Operations, the initial Systems Requirements Document and constraints identified by the agencies. This document sets the technical scope of the system to be built for the Demonstration Project. It is the basis for verifying the system and sub-systems when delivered via the Verification Plan |
| Rosap ID | dot:3473 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/3473 |
| TRT Terms | Project management; Integrated corridor management; Multimodal transportation; Decision support systems; Real time data processing; Data sharing; Information systems; Transportation system management; Performance |
| Geographical Coverage |
Dallas (Texas) |
| TRIS Online Accession No |
1551439 |
| Contract Number | DTFH61-06-D-00004 |
| Report Number | FHWA-JPO-11-047 |
| Availability | Intelligent Transportation Systems Joint Program Office |
| Resource type | Tech Report |
| URL | https://ntlrepository.blob.core.windows.net/lib/54000/54100/54136/US-75_ICMS_Requirements_-_Demonstration_Phase_FINAL_Formatted.pdf |
| Format | |
| Database | NTL Digital Repository |