NTL Record

Title Description of the San Diego Trolley: San Diego Trolley Implementation Process Evaluation
Record ID 56382
Corporate Creator San Diego Association of Governments; United States. Urban Mass Transportation Administration
Publisher United States. Department of Transportation; San Diego Association of Governments
Publication Date 19820701
Language English
Abstract Following an 18-month analysis of transit alternatives, the San Diego Metropolitan Transit Development Board of Directors made a determination that the San Diego Trolley was a feasible project in June 1978. Final design engineering was initiated in January 1979, the first construction contracts were awarded in December 1979, and revenue service was initiated in July 1981. This paper reviews the following: Planning and approval; System characteristics; System operations; Forecasted patronage; Costs and funding; and Rail freight operations.
Rosap ID dot:445
Rosap URL https://rosap.ntl.bts.gov/view/dot/445
TRT Terms Costs; Financing; Freight service; Ridership; System design; Transit vehicle operations
General Subjects Planning and Forecasting; Public Transportation; Railroads; I72: Traffic and Transport Planning
Geographical
Coverage
San Diego (California); Washington (District of Columbia); United States
TRIS Online
Accession No
1587405
Report Number working paper no. 7
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/56000/56300/56382/descriptionofsan07unse_0.pdf
Format PDF
Database NTL Digital Repository