| Title | Description of the San Diego Trolley: San Diego Trolley Implementation Process Evaluation |
|---|---|
| Record ID | 56382 |
| Corporate Creator | San Diego Association of Governments; United States. Urban Mass Transportation Administration |
| Publisher | United States. Department of Transportation; San Diego Association of Governments |
| Publication Date | 19820701 |
| Language | English |
| Abstract | Following an 18-month analysis of transit alternatives, the San Diego Metropolitan Transit Development Board of Directors made a determination that the San Diego Trolley was a feasible project in June 1978. Final design engineering was initiated in January 1979, the first construction contracts were awarded in December 1979, and revenue service was initiated in July 1981. This paper reviews the following: Planning and approval; System characteristics; System operations; Forecasted patronage; Costs and funding; and Rail freight operations. |
| Rosap ID | dot:445 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/445 |
| TRT Terms | Costs; Financing; Freight service; Ridership; System design; Transit vehicle operations |
| General Subjects | Planning and Forecasting; Public Transportation; Railroads; I72: Traffic and Transport Planning |
| Geographical Coverage |
San Diego (California); Washington (District of Columbia); United States |
| TRIS Online Accession No |
1587405 |
| Report Number | working paper no. 7 |
| Resource type | Tech Report |
| URL | https://ntlrepository.blob.core.windows.net/lib/56000/56300/56382/descriptionofsan07unse_0.pdf |
| Format | |
| Database | NTL Digital Repository |