| Title | USDOT Guidance Summary for Connected Vehicle Deployments : System Requirements and the CVRIA/Set-It Tool : Final Report |
|---|---|
| Record ID | 60496 |
| Personal Name Creator |
Krause, Cory; Fehr, Walt |
| Corporate Creator | Noblis, Inc. |
| Corporate Contributor |
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office |
| Publisher | United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office |
| Publication Date | 20160701 |
| Language | English |
| Abstract | This document provides guidance material in regards to System Requirements for the CV Pilots Deployment Concept Development Phase. Methods for system engineering are discussed with definitions for the successful management of each aspect. Important references are given in terms of Laws and Regulations, in-text footnotes, and additional guidance documents. How system engineering ties into the Concept Development Phase deliverables is discussed with a focus on the Tasks 2 and 6. Major challenges are identified and how they can be overcome. The document concludes with a summary of available CV systems engineering training. |
| Rosap ID | dot:34725 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/34725 |
| ResearchHub ID | 236 |
| TRT Terms | Systems engineering; System architecture; Intelligent transportation systems |
| General Subjects | Systems engineering; System requirements; CVRIA; Reference architecture; Research Hub |
| Geographical Coverage |
United States |
| TRIS Online Accession No |
1618941 |
| Contract Number | DTFH61-11-D-00018 |
| Report Number | FHWA-JPO-16-344 |
| Availability | Intelligent Transportation Systems Joint Program Office |
| Resource type | Tech Report |
| URL | https://ntlrepository.blob.core.windows.net/lib/60000/60400/60496/FHWA-JPO-16-344.pdf |
| Format | |
| Database | NTL Digital Repository |