NTL Record

Title FHWA Project R05 IAP Funded Project Case Study: Louisiana I-20 Ramp Rehabilitation Using Precast Concrete Pavement
Record ID 65747
Personal Name
Creator
Tayabji, Shiraz D.
Personal Name
Contributor
Tyson, Samuel S.
Corporate Creator Applied Research Associates, Inc.
Corporate
Contributor
United States. Department of Transportation. Federal Highway Administration. Office of Infrastructure
Publisher United States. Federal Highway Administration
Publication Date 20180701
Language English
Abstract Repair and rehabilitation of the aging highway infrastructure continues to be a challenging endeavor for all U.S. highway agencies. Thousands of miles of highway pavements need rehabilitation, and many of these highways carry over 100,000 vehicles/day, including a large percentage of trucks. Extended lane closures must be avoided to prevent compounding congestion—which means rehabilitation work must be completed rapidly. While many projects have been completed using rapid-setting concrete, results have been inconsistent. Precast concrete pavements (PCPs) have been shown to be promising alternatives. The production use of PCP has come a long way over the last 17 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. The Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, cost-effective solutions to meet the complex challenges facing transportation agencies. On August 7, 2015, the Federal Highway Administration—in partnership with the American Association of State Highway and Transportation Officials—announced the selection of 21 transportation agencies receiving implementation and technical assistance awards as part of Round 6 of the SHRP2 IAP. The Louisiana Department of Transportation and Development (LADOTD), one of the agencies selected as a lead adopter of Project R05 technology, received an award of $300,000 to help offset the cost of constructing a PCP project. The LADOTD also received a User Incentive Award of $75,000 to help support PCP implementation. This case study report provides details of the 2018 PCP use for rehabilitation of the distressed eastbound concrete pavement ramp onto I-20 at LA 169, in Greenwood, Louisiana.
Rosap ID dot:38325
Rosap URL https://rosap.ntl.bts.gov/view/dot/38325
TRT Terms Interchange ramps; Precast concrete pavements; Pavement maintenance
Geographical
Coverage
United States
TRIS Online
Accession No
1696737
Contract Number DTFH61-13-C-00028
Report Number FHWA-HIF-18-053
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/65000/65700/65747/FHWA-HIF-18-053.pdf
Format PDF
Database NTL Digital Repository