NTL Record

Title Replaceable Grouted External Post-Tensioned Tendons
Record ID 78477
Personal Name
Creator
Ledesma, T.
Corporate Creator WSP
Corporate
Contributor
United States. Federal Highway Administration
Publisher United States. Department of Transportation. Federal Highway Administration
Publication Date 20190901
Language English
Abstract Corrosion of prestressing strands has required replacement of external post-tensioning tendons in several existing post-tensioned bridges. External tendons are commonly used in concrete box girder bridges constructed using the span-by-span or balanced cantilever methods. Currently in the US, external tendons are discretely bonded at anchorages and deviator locations. Replacement of these types of tendons is a complex and time-consuming operation with safety concerns for personnel. Under task order 5009, WSP conducted a state-of-the-art review, then developed and presented guidance for fully replaceable grouted external tendons. Specific details included post-tensioning system components, structural design and detailing aspects, and tendon installation and replacement procedures.
Rosap ID dot:51760
Rosap URL https://rosap.ntl.bts.gov/view/dot/51760
TRT Terms Tensioning; Bridge design; Box girder bridges; Equipment replacement; Material tendons
Geographical
Coverage
United States
TRIS Online
Accession No
1754933
Contract Number DTFH61-14-D-00048
Report Number FHWA-HIF-19-067
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/78000/78400/78477/FHWA-HIF-19-067.pdf
Alternative URL https://www.fhwa.dot.gov/bridge/concrete/hif19067.pdf
Format PDF
Database NTL Digital Repository