NTL Record

Title A Precast Bridge Bent System for Seismic Regions: Phase I Report
Record ID 78836
Personal Name
Creator
Marsh, M. Lee; Stanton, John ; Eberhard, Marc O.; Haraldsson, Olafur
Corporate Creator Federal Highway Administration (U.S.)
Corporate
Contributor
BergerABAM, Inc.; University of Washington
Publisher United States. Department of Transportation. Federal Highway Administration
Publication Date 20101015
Language English
Abstract This report describes a precast concrete bridge bent system that is suitable for high seismic zones. Lateral load tests on both the top (column-to-cap) and bottom (column-to-footing) connections of the system have demonstrated that the connections have strengths and ductilities similar to those of comparable cast-in-place connections. Additional tests on the bottom connection of the system are ongoing, and construction of a demonstration bridge project will begin later this year. The final development of this system is partially funded by the FHWA’s Highways for LIFE Technology Partnerships Program (DTFH61-09-00005). Information on both the Highways for LIFE program and this project may be found at http://www.fhwa.dot.gov/hfl/.
Rosap ID dot:54119
Rosap URL https://rosap.ntl.bts.gov/view/dot/54119
TRT Terms Precast concrete; Bridge construction; Earthquake resistant design; Bents
Geographical
Coverage
United States
TRIS Online
Accession No
1323776
Contract Number DTFH61-09-00005
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/78000/78800/78836/berger_phase_1_report_20101015.pdf
Alternative URL https://www.fhwa.dot.gov/hfl/partnerships/pdfs/berger_phase_1_report_20101015.pdf
Format PDF
Database NTL Digital Repository