Title I-85 Interchange Design-Build Project Using Prefabricated Bridge Elements in West Point, GA
Record ID 78885
Personal Name
Creator
Mallela, Jagannath; Littleton, Paul; Hoffman, Gary; Gokhale, Salil V.; Ullman, Gerald L.
Personal Name
Contributor
Lord, Byron; Huie, Mary
Corporate Creator Applied Research Associates, Inc.
Corporate
Contributor
United States. Department of Transportation. Federal Highway Administration. Office of Infrastructure
Publisher United States. Federal Highway Administration
Publication Date 20130601
Language English
Abstract As part of a national initiative sponsored by the Federal Highway Administration under the Highways for LIFE program, the Georgia Department of Transportation (GDOT) was awarded a $1 million grant to demonstrate the use of proven, innovative technologies to deliver an $81 million project in less time than conventional construction. In addition, this was a 100 percent Federally funded project. This report documents the design-build project in Troup County to construct a new Interstate 85 interchange, 10 miles (16 kilometers) of four-lane frontage and access roadway, another bridge, and all other items associated with this large economic development project. The interchange includes prefabricated bridge substructure elements, used for the first time in the State. This report discusses the use of the design-build (D-B) contracting method, a first for Georgia, implemented under newly passed State legislation. The project also includes other firsts for Georgia, including requiring the D-B contractor to propose state-of-the-art methods to achieve performance expectations, the use of prefabricated elements to construct the bridge substructure and real-time traffic operations support through speed band monitoring on I-85. GDOT also set traffic incident response time goals for this project. Under conventional construction, the impact of this project on the traveling public was estimated at 30 months, but with the use of the D-B contracting technique and prefabricated bridge elements, the impact was reduced to only 16.5 months. Using D-B and other innovative techniques to accelerate the delivery schedule had a significant influence on the net construction cost. A comprehensive economic analysis including construction costs and user costs shows that the project saved about $1.98 million or about 45 percent over traditional contracting and construction methods. Because of the success of this project, GDOT is more comfortable with using the D-B method and prefabricated bridge elements on future largescale projects.
Rosap ID dot:54074
Rosap URL https://rosap.ntl.bts.gov/view/dot/54074
TRT Terms Structural connection; Design build; Prefabricated bridges; Traffic control; Roller compacted concrete; Real time information
Geographical
Coverage
United States; Georgia
TRIS Online
Accession No
1157007
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/78000/78800/78885/ga_interchange_designbuild_i85.pdf
Format PDF
Database NTL Digital Repository