NTL Record

Title Georgia Demonstration Project: Pavement Replacement Using a Precast Concrete Pavement System Along a Section of SR 11/Broad Street in Winder, Georgia
Record ID 78886
Personal Name
Creator
Tayabji, Shiraz; Bledsoe, Jay; Raghunathan, Deepak; Sadasivam, Suri; Mallela, Jagannath
Corporate Creator Applied Research Associates, Inc.
Corporate
Contributor
United States. Department of Transportation. Federal Highway Administration. Office of Infrastructure; Georgia Department of Transportation
Publisher United States. Federal Highway Administration
Publication Date 20141201
Language English
Abstract As part of a national initiative sponsored by the Federal Highway Administration under the Highways for LIFE program, the Georgia Department of Transportation (GDOT) was awarded a $700,000 grant to demonstrate the use of precast concrete pavement systems (PCPS) in city of Winder. The project is located along a section of SR 11 (commonly referred to as Broad Street) in a historic downtown area with on-street parking and variable width roadway, typically three lanes wide. This project was a cooperative effort between the GDOT and the City of Winder. This report documents the application of PCPS technology for pavement rehabilitation of a 0.72 mile section on SR11/SR 53/SR 211/Broad Street from CSX R/R to Stephens Street in Downtown Winder. Using PCPS technology on this project improved safety and mobility performance in the work zone. No incidents occurred or worker injuries during the construction period, including the lane closure periods. There was little impact on trip time through the length of the project primarily because of signalized intersections within the project length and the rail crossing at one end of the project. Several innovations included in this project are expected to improve the durability and performance of the roadway. An economic analysis indicated that agency costs were $1,220,931 (54 percent) more for this project than they would have been using conventional construction practices, and user costs were $21,560 (35 percent) more. The as-built total project cost was $3,466,615 compared to $2,245,684 for the traditional alternative. Considering that the GDOT was using this innovation for the first time, and like with any innovation, the cost premium with the use of PCPS is expected to decrease with subsequent applications
Rosap ID dot:54121
Rosap URL https://rosap.ntl.bts.gov/view/dot/54121
TRT Terms Precast concrete pavements; Construction and maintenance; Demonstration projects; State highways; Safety analysis
Geographical
Coverage
Georgia; United States
TRIS Online
Accession No
1584280
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/78000/78800/78886/ga_pcps_sr11_broadstreet.pdf
Format PDF
Database NTL Digital Repository