Title Iowa Demonstration Project: Massena IA-92 Bridge Replacement Project
Record ID 78892
Personal Name
Creator
Raghunathan, Deepak; Sadasivam, Suri; Mallela, Jagannath
Corporate Creator Applied Research Associates, Inc.
Corporate
Contributor
United States. Department of Transportation. Federal Highway Administration. Office of Infrastructure
Publisher United States. Federal Highway Administration
Publication Date 20141001
Language English
Abstract As part of a national initiative sponsored by the Federal Highway Administration under the Highways for LIFE program, the Iowa Department of Transportation (DOT) was awarded a $400,000 grant to demonstrate the use of proven, innovative technologies, including lateral bridge slide and prefabricated bridge element systems (PBES), to deliver this $2.0 million project in less time and with less impact to motorists than conventional construction. The project consisted of replacing the Iowa Highway 92 bridge (Maint. No 1563.4S092) over a small natural stream, 1 mile west of Iowa Highway 148. The replacement bridge was designed to increase the structural capacity of the bridge, improve roadway conditions, and enhance user safety by providing a wider bridge and approaching roadway. This project focused on implementation of an accelerated bridge construction (ABC) policy and first-time use of the demonstrated innovative construction methods. This was the first lateral bridge slide project in the State of Iowa. The project was let on April 16, 2013 using a design-bid-build contract, and the winning bid amount was $1.3 million. The project involved three phases: 1) construction of the bridge structure off-alignment, 2) the bridge slide-in, and 3) revetment, grading, and clean-up. The replacement structure was a single-span 120-foot by 44-foot bridge with cast-in-place abutment footings, precast wingwalls, and a precast superstructure fabricated adjacent to the existing bridge and moved into position by lateral slide. The ABC approach resulted in a full closure of 9 days with no incentives or disincentives awarded to the contractor at the end of this project. A 12.89 mile detour was utilized during the full closure, thus resulting in an out-ofdistance mileage of 6.89 miles. To estimate the cost savings for the ABC method, the total costs were computed for both the as-built bridge and a baseline (cast-in-place) scenario by adding the agency costs and user costs. The results indicated a cost savings of around 43 percent over the baseline scenario, mainly attributable to the significantly reduced user costs of the asbuilt project.
Rosap ID dot:54118
Rosap URL https://rosap.ntl.bts.gov/view/dot/54118
TRT Terms Prefabricated bridges; Lateral supports; Bridge construction; State highways
Geographical
Coverage
United States; Iowa
TRIS Online
Accession No
1577852
Resource type Tech Report
URL https://ntlrepository.blob.core.windows.net/lib/78000/78800/78892/ia_abc_massena_ia92.pdf
Format PDF
Database NTL Digital Repository