| Title | Tech Brief: Texas Saves $23M Through SHRP2 Approach to Identifying and Managing Utility Conflicts |
|---|---|
| Record ID | 79030 |
| Corporate Creator | United States. Federal Highway Administration. Office of Preconstruction, Construction, and Pavements |
| Corporate Contributor |
Texas. Dept. of Transportation |
| Publisher | United States. Federal Highway Administration |
| Publication Date | 20200701 |
| Language | English |
| Abstract | The Texas Department of Transportation implemented utility conflict management statewide to identify and resolve potential utility obstacles much earlier in a project’s life cycle. The method equips the project team with data models, templates, and other tools for documenting all utilities sharing the right of way of an infrastructure construction project. Before construction begins, the project team also coordinates with the utility on plans for how to Avoid, Minimize, or Accommodate (AMA) the conflict during design. |
| Rosap ID | dot:54457 |
| Rosap URL | https://rosap.ntl.bts.gov/view/dot/54457 |
| TRT Terms | Conflict management; Life cycle analysis; Case studies; Coordination |
| Geographical Coverage |
Texas; United States |
| TRIS Online Accession No |
1764838 |
| Report Number | FHWA-HIF-20-090 |
| Resource type | Brief |
| URL | https://ntlrepository.blob.core.windows.net/lib/79000/79000/79030/hif20090.pdf |
| Format | |
| Database | NTL Digital Repository |